Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.
Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.
Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.
+

Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

Project Nature: Industrial Project

Keywords

Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

  • DESCRIPTION
  • Overview Table of Engineering Construction

    Project Name

    Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

    Nature of the Project

    Industrial Project

    Construction Scale

    The relocation and reconstruction project is planned to have a total processing capacity of 2,610 tonnes of waste per day, comprising three 870 t/d grate-fired incineration lines, each paired with a 35 MW condensing steam turbine and a 40 MW generator unit.

    Project Address

    Southwest side of the intersection of Hongyi 5th Line and Guanyi 5th Line in Xiaoshan District, Hangzhou

    Total land area

    98,752 square meters

    Total floor area

    80,764 square meters

    Construction Entity

    Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

    Supervision Unit

    Delin United Engineering Co., Ltd.

    Surveying Unit

    Jiangxi Provincial Geophysical and Geochemical Exploration Geological Engineering Co., Ltd.

    Contract Requirements

    Construction period

    750 calendar days

    EPC General Contractor

    Design Unit

    China United Engineering Corporation (Lead Entity)

    Quality

    Ensure the “Qianjiang Cup”

    Construction Unit

    Zhejiang Shuntai Engineering Construction Co., Ltd.

    Safety

    Create a provincial-level model construction site

    Main functions or purposes of the project

    Municipal Solid Waste Incineration Power Generation

    Scope of the Engineering Contract

    All civil engineering works, equipment installation, pile foundation construction, and other related works for this project.

    Major Subcontracted Works

    Mechanical and electrical installation, etc.

     

    Main Building Names

    Number of floors (above ground)

    Number of floors (below ground)

    Gross floor area (㎡)

    Building Height (m)

    Main Plant Building

    5

    1

    53943

    55.8

    R&D Building

    5

    0

    7025

    20.9

    Office building

    5

    0

    4057

    22.7

    Wastewater Treatment Plant

    2

    0

    6061

    11.7

    Warehouse

    1

    0

    727

    11.3

    Central Pump Room

    1

    0

    1768

    9.9

    Doorman One

    1

    0

    129

    6.4

    Security Guard No. 2

    1

    0

    40

    4.1

    Dehydration Workshop

    1

    0

    323

    7.5

    Slag Resource Utilization Workshop

    1

    0

    6675

    21.8

    Chemical Warehouse

    1

    0

    16

    4.8

Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

Project Nature: Industrial Project

Consultation Hotline:

Keywords

Smart Green Circular Economy Project of Hangzhou Xiaoshan Urban Green Energy Co., Ltd.

Online Consultation

Note: Please provide your contact information, and our dedicated professionals will get in touch with you as soon as possible!

More Projects